This is a sequence of installing our 50/10 ton crane in our new addition. These pictures were taken on January 18, 2007
This picture shows a girder being removed from the bridge. This girder will then be re-installed once the crane is up on its rails.
Here they are setting up the lifting of the second girder and end trucks. Total weight of this lift will be 44,000 lbs.
The assembly is almost in place. The bottom of the bridge is about 37 feet in the air.
The girder that was removed is now being lifted and re-installed in place.
The new crane is pushed back into the building so we can start working on setting the controls for the new crane.